Treatment of fluorine and chlorine containing waste gas
Introduction
Handling Capacity: waste liquid 250kg/h
Main components of material:Fluorine and chlorine containing waste gas
Project Site:Shandong • zibo
Handling Capacity: waste liquid 250kg/h
Main components of material:Fluorine and chlorine containing waste gas
Project Site:Shandong • zibo
Copying(C)2022 Jiangsu Liyu Environmental Technology Co., Ltd 苏ICP备2022010963号 All Rights Reserved.